Balt 89875 Assembly Instructions, page 1

Page 1 of 5

Balt 89875 Assembly Instructions, page 2
Text on page 2

Hardware List

Screw M6X12mm Pan Hd

Screw M5X45mm Pan Hd

Hex nut M5 w/Flange

Lock Washer Ext Tooth

We recommend that you assemble this unit on a table. Tools required: Adjustable Crescent Wrench

Do not use unless all screws are tight. At least every six months, check all screws to be sure they are tight. If parts are missing, broken, damaged, or worn, stop use of the product until repairs are made by your dealer using factory authorized parts.

Page 2 of 5

Balt 89875 Assembly Instructions, page 3
Text on page 3

Assembly Diagram

R EAD T HROUGH I NSTRUCTIONS FROM BEGINNING

TO END BEFORE STARTING TO ASSEMBLE UNIT .

1.) Identify and Separate all the Parts and Hardware.

2.) Slide Top Shelf (P-2) over the Base Cabinet (P-1) and secure at desired height using 8 screws (A), 8 External Tooth Lock Washers (C), and 8 Hex Nuts (B).

3.) Press 2 Locking Casters (D) and 2 non-locking casters (E) into the factory installed nylon inserts in the Base Cabinet (P-1) as shown in illustration #2.

Page 3 of 5

Balt 89875 Assembly Instructions, page 4
Text on page 4

4.) Tilt 1 Pullout Shelf (P-3) and slide in from the Right Side of cart. Attach Pullout Shelf (P-3) to Top Shelf (P-2) at desired height using 8 screws (A1) and 8 Hex Nuts (B1) as shown in illustration # 3.

Loosen Hex nuts before attaching Pull Out Shelf.

5.) Tilt 1 Pullout Shelf (P-3) and slide in from the Left Side of cart. Attach Pullout Shelf (P-3) to Top Shelf (P-2) at desired height using 8 screws (A1) and 8 Hex Nuts (B1) as shown in illustration # 4.

Page 4 of 5

Balt 89875 Assembly Instructions, page 5
Text on page 5

6.) Place Rubber Mat (P-4) on the Top Shelf (P-2) as shown in illustration #5.

7.) Attach Cord Winder (P-5) and Electrical Strip (P-6) to either side of Top Shelf (P-2), or Base Cabinet (P-1) using 2 screws (A2) and 2 Hex Nuts M5 w/Flange (B2).

8.) Tighten all screws using Phillip’s head screwdriver and Wrench (Not Provided).

WWW.MYBINDING.COM

Page 5 of 5 · End of manual

Quick start

  1. Assemble on a table; you need an adjustable crescent wrench. Identify and separate all parts and hardware.
  2. Slide the Top Shelf (P-2) over the Base Cabinet (P-1) and secure it at the height you want with 8 screws (A), 8 External Tooth Lock Washers (C) and 8 Hex Nuts (B).
  3. Press 2 Locking Casters (D) and 2 non-locking casters (E) into the factory-installed nylon inserts in the base cabinet.
  4. Loosen the hex nuts, tilt one Pullout Shelf (P-3) in from the right side and attach it at the height you want with 8 screws (A1) and 8 Hex Nuts (B1). Repeat from the left side.
  5. Place the Rubber Mat (P-4) on the top shelf.
  6. Attach the Cord Winder (P-5) and Electrical Strip (P-6) to either side of the top shelf or base cabinet with 2 screws (A2) and 2 M5 flange hex nuts, then tighten all screws.

Frequently asked questions

How many pull-out shelves does the 89875 cart have?

Two, one sliding in from the right side and one from the left. See page 4.

What tools are required?

An adjustable crescent wrench, plus a Phillips head screwdriver and wrench (not provided) for final tightening. See page 2 and page 5.

Where can the electrical strip be mounted?

On either side of the top shelf or the base cabinet. See page 5.