Best-Rite 2028C Assembly Instructions, page 1

Page 1 of 6

Best-Rite 2028C Assembly Instructions, page 2
Text on page 2

Which board assembly instructions should you use?

Use L-Clip instructions for...

Use Z-Clip instructions for...

Scroll down for instructions.

Page 2 of 6

Best-Rite 2028C Assembly Instructions, page 3
Text on page 3

Z Clip Install Instructions

Top Edge of Board

a Bo

oc rd L

atio

Note: Install Masonry Anchors (D) into 1/4” Diameter predrill holes for masonry walls.

Install Drywall Anchors (E) into 1/4” Diameter predrill holes for sheet rock walls.

Lift, Tilt, and Slide Board down over the Z-Hangers. Z-Hangers should catch in the top trim on the back of the board. Draw line along bottom edge of board.

Bo

oc rd L

atio

Bottom Edge of Board

Determine board location. Measure from floor to the top edge of board. Mark with pencil line the corner location. Measure down from top edge of board 3/4”, and draw line as shown. Locate stud near each end of board and drill pilot hole along line using 1/8” drill bit.

Bo

ard

a Loc

tion

Z Brackets hang in the trim on back of board

Lift and remove board from the Z-Hangers. Measure up from bottom line of board 1-1/8”, and draw line as shown. Locate stud near each end of board and drill pilot hole along line using 1/8” drill bit.

Attach Z-Hangers (E) using Long Screws (A) as shown.

  1. Secure 2 bottom brackets (F) to the wall using 2

long screws (A) as shown. Hang board on the Z-Hangers (E).

  1. Secure board to bottom

Screw Anchor - Concrete (For Concrete walls)

Screw Anchor - Drywall (For Drywall)

brackets (F) using 2 short screws (B) as shown.

Z Clip Install

Page 3 of 6

Best-Rite 2028C Assembly Instructions, page 4
Text on page 4

L Clip Install Instructions

Bo

ard

Loc

n atio

Note: Install Masonry Anchors (D) into 1/4” Diameter predrill holes for masonry walls.

Install Drywall Anchors (E) into 1/4” Diameter predrill holes for sheet rock walls.

Top Edge of Board

Bo

Bottom Edge of Board

1 Determine board location. Measure from floor to

the bottom edge of board. Mark with pencil line the corner location. Measure up from bottom edge of board 1-1/4” and draw line as shown. Locate stud near each end of board and drill pilot holes along line using 1/8” drill bit. See diagram below.

Edge of Board

Bo

L ard

oca

16” min. 3” 24” max.

Angle Bracket

Edge of Board

oca

tion

tion

Equally Spaced

Angle Bracket Locations on Board

L ard

3 Set board on the Angle

Lift and remove board from the angle brackets. Measure down from top line of board 1” and draw line as shown. Locate stud near each end of board and drill pilot hole along line using 1/8” drill bit.

Brackets. Draw line along top edge of board.

½ the # of Angle Brackets using

2 Attach

Long Screws (B) as shown.

L Clip Install

5 Secure top Angle Brackets (A) to the wall using 6

long screws (B) as shown. Follow diagram in

  1. Set board on the bottom angle brackets.

Secure board to bottom and top brackets (A) using short screws (C) as shown.

Page 4 of 6

Best-Rite 2028C Assembly Instructions, page 5
Text on page 5

Attention

Please read and follow these instructions! Failure to follow these instructions will void your warranty and could result in board failure and possible injury.

  1. Always use the correct supplied mounting hardware for the type wall your board will be mounted on.
  2. Use the correct stated predrill for the type anchor you will be using.
  3. The Angle Brackets and Z Clips MUST be installed according to the layout and spacing as shown below.

NOTE: For more information, please refer to our web-site: www.partsandinstructions.com

WWW.MYBINDING.COM

Page 5 of 6

Best-Rite 2028C Assembly Instructions, page 6
Text on page 6

Proper L-Clip Layout

Your top and bottom L-Clip layouts should be spaced like this for an 8’ wide board.

If you don’t use this number of L-Clips on top and bottom, your board could end up like this. Please follow these installation directions.

Page 6 of 6 · End of manual

Quick start

  1. Check page 2 to choose the Z-clip or L-clip instructions, and use the supplied hardware for your wall type: masonry anchors or drywall anchors in 1/4" predrilled holes.
  2. Z-clip: Mark the top edge of the board, draw a line 3/4" below it, and drill 1/8" pilot holes into a stud near each end. Attach the Z-hangers with long screws.
  3. Z-clip: Hang the board so the hangers catch the top trim, mark the bottom edge, remove the board, draw a line 1-1/8" above it and fix the 2 bottom brackets. Rehang the board and screw it to the bottom brackets with 2 short screws.
  4. L-clip: Mark the bottom edge of the board, draw a line 1-1/4" above it, drill 1/8" pilot holes into studs and attach half of the angle brackets with long screws, equally spaced 16" minimum to 24" maximum apart.
  5. L-clip: Set the board on the brackets and mark its top edge, remove it, draw a line 1" below the top line and fix the top angle brackets with long screws.
  6. L-clip: Set the board on the bottom brackets and secure it to the top and bottom brackets with short screws.

Frequently asked questions

Should I use Z-clip or L-clip mounting?

The instructions include both methods. Page 2 tells you which to use. See page 2.

What size holes do the wall anchors need?

Masonry anchors (for masonry walls) and drywall anchors (for sheet rock) both go into 1/4" predrilled holes. Pilot holes into studs use a 1/8" bit. See page 3.

How far apart should the angle brackets be?

Equally spaced, 16" minimum and 24" maximum apart. Brackets and Z-clips must follow the layout shown, or the board could fail. See page 4 and page 5.

Will incorrect installation affect the warranty?

Yes. Not following the instructions voids the warranty and could result in board failure and possible injury. See page 5.