

Page 1 of 6

Text on page 2
Which board assembly instructions should you use?
Use L-Clip instructions for...
Use Z-Clip instructions for...
Scroll down for instructions.
Page 2 of 6

Text on page 3
Z Clip Install Instructions
Top Edge of Board
a Bo
oc rd L
atio
Note: Install Masonry Anchors (D) into 1/4” Diameter predrill holes for masonry walls.
Install Drywall Anchors (E) into 1/4” Diameter predrill holes for sheet rock walls.
Lift, Tilt, and Slide Board down over the Z-Hangers. Z-Hangers should catch in the top trim on the back of the board. Draw line along bottom edge of board.
Bo
oc rd L
atio
Bottom Edge of Board
Determine board location. Measure from floor to the top edge of board. Mark with pencil line the corner location. Measure down from top edge of board 3/4”, and draw line as shown. Locate stud near each end of board and drill pilot hole along line using 1/8” drill bit.
Bo
ard
a Loc
tion
Z Brackets hang in the trim on back of board
Lift and remove board from the Z-Hangers. Measure up from bottom line of board 1-1/8”, and draw line as shown. Locate stud near each end of board and drill pilot hole along line using 1/8” drill bit.
Attach Z-Hangers (E) using Long Screws (A) as shown.
- Secure 2 bottom brackets (F) to the wall using 2
long screws (A) as shown. Hang board on the Z-Hangers (E).
- Secure board to bottom
Screw Anchor - Concrete (For Concrete walls)
Screw Anchor - Drywall (For Drywall)
brackets (F) using 2 short screws (B) as shown.
Z Clip Install
Page 3 of 6

Text on page 4
L Clip Install Instructions
Bo
ard
Loc
n atio
Note: Install Masonry Anchors (D) into 1/4” Diameter predrill holes for masonry walls.
Install Drywall Anchors (E) into 1/4” Diameter predrill holes for sheet rock walls.
Top Edge of Board
Bo
Bottom Edge of Board
1 Determine board location. Measure from floor to
the bottom edge of board. Mark with pencil line the corner location. Measure up from bottom edge of board 1-1/4” and draw line as shown. Locate stud near each end of board and drill pilot holes along line using 1/8” drill bit. See diagram below.
Edge of Board
Bo
L ard
oca
16” min. 3” 24” max.
Angle Bracket
Edge of Board
oca
tion
tion
Equally Spaced
Angle Bracket Locations on Board
L ard
3 Set board on the Angle
Lift and remove board from the angle brackets. Measure down from top line of board 1” and draw line as shown. Locate stud near each end of board and drill pilot hole along line using 1/8” drill bit.
Brackets. Draw line along top edge of board.
½ the # of Angle Brackets using
2 Attach
Long Screws (B) as shown.
L Clip Install
5 Secure top Angle Brackets (A) to the wall using 6
long screws (B) as shown. Follow diagram in
- Set board on the bottom angle brackets.
Secure board to bottom and top brackets (A) using short screws (C) as shown.
Page 4 of 6

Text on page 5
Attention
Please read and follow these instructions! Failure to follow these instructions will void your warranty and could result in board failure and possible injury.
- Always use the correct supplied mounting hardware for the type wall your board will be mounted on.
- Use the correct stated predrill for the type anchor you will be using.
- The Angle Brackets and Z Clips MUST be installed according to the layout and spacing as shown below.
NOTE: For more information, please refer to our web-site: www.partsandinstructions.com
WWW.MYBINDING.COM
Page 5 of 6

Text on page 6
Proper L-Clip Layout
Your top and bottom L-Clip layouts should be spaced like this for an 8’ wide board.
If you don’t use this number of L-Clips on top and bottom, your board could end up like this. Please follow these installation directions.
Page 6 of 6 · End of manual
Quick start
- Z-Clip: Measure from the floor to the top edge of the board and mark it. Draw a line 3/4" below the top edge, find a stud near each end and drill 1/8" pilot holes on the line.
- Attach the Z-Hangers with the long screws, then lift, tilt and slide the board down so the hangers catch in the top trim on the back. Draw a line along the bottom edge.
- Remove the board, draw a line 1-1/8" above the bottom line, drill pilot holes at studs, and secure the 2 bottom brackets with long screws.
- Rehang the board on the Z-Hangers and fasten it to the bottom brackets with 2 short screws.
- L-Clip: Mark the bottom edge of the board, draw a line 1-1/4" above it, drill 1/8" pilot holes at studs, and attach half of the angle brackets with long screws.
- Set the board on the bottom brackets and draw a line along its top edge. Remove the board, draw a line 1" below that line, drill pilot holes and secure the top brackets.
- Set the board back on the bottom brackets and fasten it to the top and bottom brackets with short screws.
- For masonry or drywall, drill 1/4" diameter holes and install the supplied masonry or drywall anchors before driving screws.
Frequently asked questions
What anchors do I use for a concrete or drywall wall?
Use the supplied masonry anchors for masonry walls and the drywall anchors for sheet rock walls, each set into a 1/4" diameter predrilled hole. See page 3.
What size pilot holes should I drill into studs?
Drill pilot holes with a 1/8" drill bit along your marked lines, at a stud near each end of the board. See page 3 and page 4.
How far apart should the L-Clip angle brackets be spaced?
The diagram shows brackets equally spaced, 3" from the board edge, with spacing of 16" minimum and 24" maximum. See page 4.
