Best-Rite 62853 Assembly Instructions, page 1

Page 1 of 7

Best-Rite 62853 Assembly Instructions, page 2

Page 2 of 7

Best-Rite 62853 Assembly Instructions, page 3
Text on page 3

EWhiteboard Track System

Long Screw (1-1/4” )

Screw Anchor - Concrete

Screw Anchor - Drywall

Bottom Bracket Washer 2 EA

Use Screw Anchor (C) in place of Screw Anchor (B) for Drywall Applications.

Should you require assistance during assembly, please call our Customer Service Department Monday - Friday 8 a.m. - 5 p.m. Central Standard Time

Missing Parts or UPS Damaged Parts For Your Convenience you can EMAIL us at

support@moorecoinc.com

24HOURS 7 DAYS A WEEK

Toll-Free Customer Service

Important Information

Do not use unless all screws are tight. At least every six months, check all screws to be sure they are tight. If parts are missing, broken, damaged, or worn, stop use of the product until repairs are made by your dealer using factory authorized parts.

Page 3 of 7

Best-Rite 62853 Assembly Instructions, page 4
Text on page 4

To Assemble and Attach to Wall:

  1. Identify and Separate all the Parts and Hardware.
  2. Remove the right End Cap’s securing screw and the right End Cap on the Track (P-1) assembly. Slide the Tack Strip out of the Track. You may also remove the plastic Paper Holders out of the Track as shown in illustration #1.

Securing Screw

  1. Place your Track (P-1) on the wall at the height you have chosen and center. Draw a line along the bottom edge of the Track. If you are mounting the Track to a stud wall, determine the stud locations and predrill a 1/8” diameter hole through the Track in the center of the Tack Strip’s recess and into the wall stud. Attach the Track (P-1) to the wall using the Long Screws (A). See illustration #2.

NOTE: Make sure you have a Long Screw (A) holding the Track (P-1) at 6” or less from each end. This may require you to install a drywall Screw Anchor (C) into the wall first and then connect using a Long Screw (A) through the Track and into the Screw Anchor. See Detail

Drill 1/8” Dia. Screw Hole

Page 4 of 7

Best-Rite 62853 Assembly Instructions, page 5
Text on page 5

3A. For Masonry Walls:

Follow Step 3 and drill through the Track (P-1) and into the masonry wall with a 1/8” diameter drill on 16” centers and about 6” from each end. Remove the Track and drill a 1/4” diameter hole into each 1/8” hole in the wall. Install Masonry Anchors (B) into the 1/4” diameter holes.

  1. Insert the plastic Paper Holders back into the bottom groove in the Track (P-1). Slide the Tack Strip insert back into the top recess in the Track. Replace the right End Cap and secure in place with the Securing Screw you removed in Step #2. .

Securing Screw

Page 5 of 7

Best-Rite 62853 Assembly Instructions, page 6
Text on page 6
  1. Hanging a board on the Intuition Track System:

Slide on two Top Brackets (P-2) over the top extrusion of your board as shown in illustration #5. Push one Top Brackets to the far left and one to the far right of your board. Install one Top Bracket Screw (D) into each Top Bracket (P-2) and finger tighten to secure in place. . D

  1. Assemble the Bottom Bracket (P-3) to the Bottom Wheel (P-4) using a Bottom Bracket Screw (E) and Bottom Bracket Washer (F) as shown in illustration #6. Repeat this step for the second Bottom Bracket assembly. Leave the Bottom Bracket Screws loose.

Page 6 of 7

Best-Rite 62853 Assembly Instructions, page 7
Text on page 7
  1. Slide each Bottom Bracket assembly on the bottom extrusion of your board as shown in illustration #7. Finger tighten each Bottom Bracket Screw (E) to secure Bottom Bracket assemblies in place. .
  2. Hook your board’s Top Brackets over the top of the Track (P-1). Your board should now be able to slide right or left on the Intuition Track System. See illustration #8. .

WWW.MYBINDING.COM

WTS_09-26-14

Page 7 of 7 · End of manual

Quick start

  1. Identify and separate all the parts and hardware.
  2. Remove the right end cap's securing screw and the end cap, then slide the tack strip (and the plastic paper holders, if you like) out of the track.
  3. Center the track on the wall at your chosen height and draw a line along its bottom edge. On studs, drill 1/8" holes through the center of the tack strip recess into the studs and fasten with the long screws.
  4. Make sure a long screw holds the track within 6" of each end, using a drywall screw anchor where there is no stud.
  5. Refit the paper holders in the bottom groove and the tack strip in the top recess, then replace the end cap and its securing screw.
  6. Slide two top brackets onto the top of your board, one at each far end, and finger-tighten a top bracket screw in each.
  7. Assemble each bottom bracket to a bottom wheel with a screw and washer, slide them onto the bottom of the board and finger-tighten.
  8. Hook the board's top brackets over the track. The board can now slide right or left.

Frequently asked questions

How do I mount the track on a masonry wall?

Drill 1/8" holes through the track into the wall on 16" centers and about 6" from each end. Remove the track, enlarge each hole to 1/4" and install the masonry anchors. See page 5.

How close to the ends of the track must the screws be?

A long screw should hold the track at 6" or less from each end. If there is no stud there, install a drywall screw anchor first. See page 4.

How do I hang a board on the track?

Fit two top brackets on the board's top edge and two bottom bracket and wheel assemblies on its bottom edge, then hook the top brackets over the track. See page 6.

What maintenance does the track system need?

Check that all screws are tight at least every six months. Stop using it if any parts are missing, broken, damaged or worn until they are repaired with factory-authorized parts. See page 3.