

Page 1 of 6

Text on page 2
Which board assembly instructions should you use?
Use L-Clip instructions for...
Use Z-Clip instructions for...
Scroll down for instructions.
Page 2 of 6

Text on page 3
Z Clip Install Instructions
Top Edge of Board
a Bo
oc rd L
atio
Note: Install Masonry Anchors (D) into 1/4” Diameter predrill holes for masonry walls.
Install Drywall Anchors (E) into 1/4” Diameter predrill holes for sheet rock walls.
Lift, Tilt, and Slide Board down over the Z-Hangers. Z-Hangers should catch in the top trim on the back of the board. Draw line along bottom edge of board.
Bo
oc rd L
atio
Bottom Edge of Board
Determine board location. Measure from floor to the top edge of board. Mark with pencil line the corner location. Measure down from top edge of board 3/4”, and draw line as shown. Locate stud near each end of board and drill pilot hole along line using 1/8” drill bit.
Bo
ard
a Loc
tion
Z Brackets hang in the trim on back of board
Lift and remove board from the Z-Hangers. Measure up from bottom line of board 1-1/8”, and draw line as shown. Locate stud near each end of board and drill pilot hole along line using 1/8” drill bit.
Attach Z-Hangers (E) using Long Screws (A) as shown.
- Secure 2 bottom brackets (F) to the wall using 2
long screws (A) as shown. Hang board on the Z-Hangers (E).
- Secure board to bottom
Screw Anchor - Concrete (For Concrete walls)
Screw Anchor - Drywall (For Drywall)
brackets (F) using 2 short screws (B) as shown.
Z Clip Install
Page 3 of 6

Text on page 4
L Clip Install Instructions
Bo
ard
Loc
n atio
Note: Install Masonry Anchors (D) into 1/4” Diameter predrill holes for masonry walls.
Install Drywall Anchors (E) into 1/4” Diameter predrill holes for sheet rock walls.
Top Edge of Board
Bo
Bottom Edge of Board
1 Determine board location. Measure from floor to
the bottom edge of board. Mark with pencil line the corner location. Measure up from bottom edge of board 1-1/4” and draw line as shown. Locate stud near each end of board and drill pilot holes along line using 1/8” drill bit. See diagram below.
Edge of Board
Bo
L ard
oca
16” min. 3” 24” max.
Angle Bracket
Edge of Board
oca
tion
tion
Equally Spaced
Angle Bracket Locations on Board
L ard
3 Set board on the Angle
Lift and remove board from the angle brackets. Measure down from top line of board 1” and draw line as shown. Locate stud near each end of board and drill pilot hole along line using 1/8” drill bit.
Brackets. Draw line along top edge of board.
½ the # of Angle Brackets using
2 Attach
Long Screws (B) as shown.
L Clip Install
5 Secure top Angle Brackets (A) to the wall using 6
long screws (B) as shown. Follow diagram in
- Set board on the bottom angle brackets.
Secure board to bottom and top brackets (A) using short screws (C) as shown.
Page 4 of 6

Text on page 5
Attention
Please read and follow these instructions! Failure to follow these instructions will void your warranty and could result in board failure and possible injury.
- Always use the correct supplied mounting hardware for the type wall your board will be mounted on.
- Use the correct stated predrill for the type anchor you will be using.
- The Angle Brackets and Z Clips MUST be installed according to the layout and spacing as shown below.
NOTE: For more information, please refer to our web-site: www.partsandinstructions.com
WWW.MYBINDING.COM
Page 5 of 6

Text on page 6
Proper L-Clip Layout
Your top and bottom L-Clip layouts should be spaced like this for an 8’ wide board.
If you don’t use this number of L-Clips on top and bottom, your board could end up like this. Please follow these installation directions.
Page 6 of 6 · End of manual
Quick start
- Check which method fits your board: Z-clip or L-clip (angle bracket) mounting.
- Z-clip: mark the top edge, draw a line 3/4" below it, drill pilot holes at studs with a 1/8" bit and attach the Z-hangers with long screws.
- Z-clip: slide the board down over the Z-hangers, mark the bottom edge, then drill 1-1/8" above that line, fit the two bottom brackets and secure the board with short screws.
- L-clip: mark the bottom edge, draw a line 1-1/4" above it, drill 1/8" pilot holes and attach half the angle brackets with long screws.
- L-clip: set the board on the brackets, mark the top edge, drill 1" below that line, fit the top brackets and fasten the board top and bottom with short screws.
- In masonry walls use the masonry anchors, and in drywall use the drywall anchors, both in 1/4" predrilled holes.
Frequently asked questions
Should I use L-clip or Z-clip mounting?
The sheet includes both methods and asks you to check which applies to your board before starting (page 2).
What size holes do the wall anchors need?
Masonry and drywall anchors go into 1/4" predrilled holes. Pilot holes into studs are drilled with a 1/8" bit (page 3).
How should L-clips be spaced?
Brackets are equally spaced, 16" minimum to 24" maximum apart, starting about 3" from the board edge. The layout on page 6 shows the correct top and bottom pattern for an 8' board.
Can not following the instructions affect the warranty?
Yes. Failing to use the correct hardware, predrill and bracket layout will void the warranty and could cause board failure (page 5).
