SPECIFICATIONS
Model Power Weight (lbs) Machine Size
A B C D
Width Height
CN-4015 220V / 240V 5kw
CN-4520 220V / 240V 6kw
CN-4520AL 220V / 240V 8kw
27.6in 6.3in 17.7in 23.6in 13.8in 5.9in
31.5in 8.3in 19.7in 27.6in 15.7in 7.9in
39.4in 8.3in 19.7in 27.6in 15.7in 7.9in
Page 3 of 7

Text on page 4
VOLTAGE – CONTROL IMPORTANT NOTES
- When shrink wrapping is carried out, but the film is not uniform or not complete, please modify by increasing the shrinking temperature or decreasing the speed of the conveyor.
- If the film tears or blows during shrink wrapping, please modify by decreasing the shrinking temperature or increasing the speed of the conveyor.
When machine operation is complete, please turn off the following switches in order
- Turn the “Temperature Adjustment” back to 0.
- Turn off the “Temperature Switch” and keep operating the conveyor for at least 10 minutes to allow the shrink tunnel to cool
- Turn the “Conveyor Adjustment” back to 0.
- Switch off the “Conveyor Start.”
- Turn off the “Source Switch.”
Page 4 of 7

Text on page 5
SPARE PARTS LIST
E-Ty pe Ring, 184 pcs/tunnel
Socket Heat Set Screw
Transmission Chain,4*2LSA-1,184L*36, 2 pcs/tunnel
Hex agon Head Bolt
Bolt Hex agon Head Screw
L-Ty pe Bracket for Heater Tube
Socket Heat Set Screw
I-Ty pe Connecting Brass
Stainless Steel Under Tunnel
Cov er Protecting Hood
U-Ty pe Guard Rail
Knob/ Conv ey or Potentionmeter
Upper Stainless Steel Tunnel
L-Ty pe Guard Rail
81-1 Conv ey or Rate Variable Resistance
Sw itch/ Upper Heater
I-Ty pe Connecting Brass Strip
Ceramic in Heat Tube
Hex agon Head Bolt
84-1 Upper Heater Variable Resistance
Heater tube L-Ty pe Bracket
Volt Meter/Low er Heater
Volt Meter Cov er
Knob/ Low er Potentiometer
89-1 Low er Heater Variable Resistance
U-Ty pe Guard Rail
Ball Bearing (same as #31)
Sw itch/4 P, Low er Heater
Central Shaft ( same as #30)
Sw itch/ Tw o Sides Heater, 4P
Hex agon Head Bolt
C-Ty pe Ring (same as #29)
Conv ey or & Fan Sw itch
Hex agon Head Bolt
Central Shaft, includes C-Ty pe Ring
Complete Set, Central Shaft w /Teflon
Locking Circuit Board Support
Bar ,Conv ey or Roller, 92 pcs/tunnel
Conv ey or Roller, 80pcs/set
Silicon Glass Fiber Tube, 92 pcs/tunnel
33+34 Conv ey or Roller w /sleev e
Complete Conv ey or 2(#36),92(#34),184(#35),92(#33)
PC Board/Motor/Conv ey or
Net Ty pe Conv ey or Belt
Page 5 of 7

Page 6 of 7

Page 7 of 7 · End of manual
Quick start
- Set the shrinking temperature and conveyor speed for your film.
- If the film shrinks unevenly or incompletely, raise the temperature or slow the conveyor.
- If the film tears or blows, lower the temperature or speed up the conveyor.
- When finished, turn the Temperature Adjustment back to 0.
- Turn off the Temperature Switch and keep the conveyor running for at least 10 minutes so the tunnel cools.
- Turn the Conveyor Adjustment back to 0, switch off Conveyor Start, then turn off the Source Switch.
Troubleshooting
| Problem | Likely cause | Fix (from the manual) |
|---|---|---|
| Film is not uniform or not completely shrunk | Temperature too low or conveyor too fast | Increase the shrinking temperature or decrease the conveyor speed. Page 4 |
| Film tears or blows during shrink wrapping | Temperature too high or conveyor too slow | Decrease the shrinking temperature or increase the conveyor speed. Page 4 |
Frequently asked questions
What power does the CN-4520 shrink tunnel need?
The CN-4520 runs on 220V/240V and is rated at 6kw. The CN-4015 is 5kw and the CN-4520AL is 8kw. See page 3.
How do I shut the shrink tunnel down safely?
Turn the temperature to 0, switch off the heat and let the conveyor run at least 10 minutes to cool the tunnel, then set the conveyor to 0, stop it and turn off the source switch. See page 4.
Why is my shrink film tearing?
The manual says to lower the shrinking temperature or increase the conveyor speed. See page 4.