
Text on page 1
Required space for mounting the F700‐1 A minimum 7’ ceiling is required, (84” 2.1 M). Recommended to use an 8’ ceiling.
Total vertical space required is 76” ( 1.9 M)
The top hole in the top bracket must be a minimum 6” (15.2 cm) below the ceiling to allow for clearance of the media clamp.
By measuring 70” (178 cm) down from the location of the top bracket hole, that represents the very bottom of the machine in relation to the floor.
CEILING
Location of the top bracket hole 6” to the ceiling
FLOOR
mybinding.com 1-800-944-4573
