Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 1

Page 1 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 2

Page 2 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 3
Text on page 3

Summary

INTRODUCTION __________________________________________________ 5

1.1 SYMBOLS OF SAFETY _______________________________________________________________ 7 1.2 SYMBOLS OF PROHIBITION AND OBLIGATORINESS _______________________________________ 8 1.3 THE SAFETY DURING THE USE OF THE MACHINE _________________________________________ 9 1.3.1 general ________________________________________________________________________ 9 1.3.2 SAFETY WARNINGS ______________________________________________________________ 9 1.4 SAFETY CLOTHING _______________________________________________________________ 10 1.5 INSTALLATION OF ELECTRICAL CABLES AND PIPES ______________________________________ 11 1.6 SAFETY EQUIPMENTS IN THE PERFECT BINDER _________________________________________ 11 1.6.1 Emergency button ______________________________________________________________ 11 1.6.2 Green button for start cycle ____________________________________________________ 12 1.6.3 SAFETY light curtains ___________________________________________________________ 12 1.6.4 Protection plate of the milling station ____________________________________________ 13 1.6.5 MAIN SWITCH __________________________________________________________________ 13 1.7 RISKS __________________________________________________________________________ 14 1.8 PURPOSE _______________________________________________________________________ 15 1.8.1 uses not provided, uses prohibited _______________________________________________ 15

TECHNICAL SHEET MASTERBOOK300 ________________________________ 16

2.1.1 Electrical _____________________________________________________________________ 18 2.1.2 Pneumatics ____________________________________________________________________ 18 Air quality provided to the Perfect Binder _______________________________________________ 19 DIN ISO 8573-1 – air quality class ________________________________________________________ 19

ACCESSORIES __________________________________________________ 20

TRANSPORTATION ______________________________________________ 21

STORAGE _____________________________________________________ 23

LAYOUT ______________________________________________________ 24

POSITIONING AND WORKSPACES ____________________________________ 24

INSTALLATION _________________________________________________ 26

8.1 TECHNICAL STAFF FOR THE INSTALLATION ___________________________________________ 26 8.2 PHYSICAL CHARACTERISTICS OF THE AREA OF PLACEMENT ______________________________ 26 8.3 SUPPORT SURFACE _______________________________________________________________ 26 8.4 WEATHER PROTECTION ___________________________________________________________ 26 8.5 LIGHT _________________________________________________________________________ 27 8.6 ENVIRONMENTAL CONDITIONS ______________________________________________________ 27 8.7 ELECTRICAL CONNECTION _________________________________________________________ 28 8.7.1 Ground connection _____________________________________________________________ 28

Page 3 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 4
Text on page 4

TRAINING OF THE OPERATOR ______________________________________ 29

10 POWER ON ____________________________________________________ 30

10.1 FUNDAMENTALS ____________________________________________________________________ 31 10.2 ELECTRICAL CONNECTION _____________________________________________________________ 33 10.3 PNEUMATIC CONNECTION _____________________________________________________________ 33 10.4 DESCRIPTION OF THE GROUPS __________________________________________________________ 34 10.5 CHIPS ASPIRATOR ___________________________________________________________________ 37 10.7 PUR TANK OPENING AND CLOSING , AND GLUE LOADING . _________________________________________ 39 10.7.1 Opening of the PUR tank ________________________________________________________ 39 WARNINGS ON THE OPENESS OF PUR TANK ________________________________________________ 39 10.7.2 preparation and loading of the pur glue __________________________________________ 41 10.7.3 Cleaner loading ________________________________________________________________ 43

11 FUNCTIONS OF THE PERFECT BINDER ________________________________ 45

11.1 HOME PAGE ________________________________________________ E RROR ! B OOKMARK NOT DEFINED . 11.2 HOME PAGE ________________________________________________ E RROR ! B OOKMARK NOT DEFINED . 11.3 NAVIGATION MENU OF THE PARAMETER PAGES ________________________ E RROR ! B OOKMARK NOT DEFINED . 11.4 FAST CONFIGURATION OF THE BOOK _______________________________ E RROR ! B OOKMARK NOT DEFINED . 11.4.1 Navigation Through the menus _____________________________ Error! Bookmark not defined. 11.4.2 Page to display production meters _________________________ Error! Bookmark not defined.

12 PAGE FOR TIMER MANAGEMENT ____________ ERROR! BOOKMARK NOT DEFINED.

13 PAGES OF ALARMS ______________________ ERROR! BOOKMARK NOT DEFINED.

14 PARAMETERIZATION OF EACH GROUP _______________________________ 51

14.1 PARAMETER OF CLAMP / FEEDER _________________________________ E RROR ! B OOKMARK NOT DEFINED . 14.2 PARAMETER OF THE MILLING STATION ______________________________ E RROR ! B OOKMARK NOT DEFINED . 14.3 P ARAMETER OF THE GLUE HEAD __________________________________ E RROR ! B OOKMARK NOT DEFINED . 14.4 T EMPERATURE OF THE HEAD AND THE PRE - MELTING UNIT ________________ E RROR ! B OOKMARK NOT DEFINED . 14.4.1 Head glue processing information __________________________ Error! Bookmark not defined. 14.5 P ARAMETER OF THE PRESS _____________________________________ E RROR ! B OOKMARK NOT DEFINED . 14.6 P ARAMETER OF THE COVER _____________________________________ E RROR ! B OOKMARK NOT DEFINED .

15 ACCESS TO THE PAGES OF THE MANUAL HANDLINGERROR! BOOKMARK NOT DEFINED.

15.1 MANUAL MOVEMENTS OF THE CLAMP _______________________________ E RROR ! B OOKMARK NOT DEFINED . MA NUAL MOVEMENTS OF THE FEEDER ___________________________________ E RROR ! B OOKMARK NOT DEFINED . 15.2 M ANUAL MOVEMENTS OF THE M ILLING S TATION _______________________ E RROR ! B OOKMARK NOT DEFINED . 15.3 M ANUAL MOVEMENTS OF THE GLUE HEAD ___________________________ E RROR ! B OOKMARK NOT DEFINED . 15.4 M ANUAL MOVEMENTS OF THE P RESS _______________________________ E RROR ! B OOKMARK NOT DEFINED . 15.5 M ANUAL MOVEMENT OF THE COVER _______________________________ E RROR ! B OOKMARK NOT DEFINED .

16 OPERATION OF THE SYSTEM IN STANDBY _____ ERROR! BOOKMARK NOT DEFINED.

17 CLEANING USING CLEANER AND LOADING GLUE ERROR! BOOKMARK NOT DEFINED.

18 PAGE OF JOB MANAGEMENT _______________ ERROR! BOOKMARK NOT DEFINED.

Page 4 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 5
Text on page 5

18.1 P AGE OF JOB MANAGEMENT _____________________________________ E RROR ! B OOKMARK NOT DEFINED .

19 GLUE RECOVERY PROCEDURE ______________________________________ 64

20 COVER POSITIONING _____________________________________________ 67

PREPARATION OF THE MACHINE TO PRODUCE A BOOK. _____________________ 69

21 CLEANING THE MACHINE _________________________________________ 72

PROCEDURE TO CLEAN THE SPINE GLUE EXTRUDER . ____________________________________________ 73

P ROCEDURE TO CLEAN THE GLUE SIDE EXTRUDERS . ____________________________________________ 75 “ END OF JOB ” CLEANING _____________________________________________________________ 78 DETAILS CLEANING _________________________________________________________________ 80

22 PROBLEMS - SOLUTIONS __________________________________________ 83

CHIPS ASPIRATOR – L ESS VACUUM: ___________________________________________________ 83 C LAMP – IT DOES ’ T START : ____________________________________________________________ 83 IRREGULAR GLUE START / STOP : ___________________________________________________ 83 MILLING STATION – IRREG ULAR CUT AND NOTCHING : _______________________________________ 83 C OVER PLATE MILLING STATION – IT DOES ’ T OPEN / CLOSE CORRE CTLY : _________________________ 83 HEAD - OUT OF TOO MUCH OR LITTLE GLUE: ___________________________________________ 83 PRESS ________________________________________________________________________ 84

Page 5 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 6
Text on page 6

1 INTRODUCTION

THE READING OF THIS OPERATOR AND MAINTE-

NANCE MANUAL IS FUNDAMENTAL FOR THE SAFETY OF THE USER AND FOR THE PROPER USE OF THE EQUIPMENT.

We thank you to have bought our product. This machine has been designed specifically for your job and your applications, and provides a high quality production and a wide range of functions. This manual describes how to use the machine, starting from the configuration phase to the most important operations. This manual has been written in order to be easily understood also by user not trained about the use of this kind of machine. For the best use of the equipment, please read carefully this manual before to use the machine. After reading, we suggest saving the manual in a safety place and don’t hesitate to read him when necessary.

Page 6 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 7
Text on page 7

DECLARATION THAT THE MACHINE IS IN SPECIFICATION TO THE EEC

DIRECTIVE CONTROLLING THE MACHINES 2006/42/CE, (AND FOLLOWING EEC DIRECTIVES)

We declare that the production of:

Model/Type: Digibook 300 Serial Number: MB300-.... Year of construction: 2012

Follows the actual releases of the EEC Controlling Directives: EEC Directive 2006/42/CE; EMC Directive 89/336/CEE; Directive controlling the Low Voltage 2006/95/CEE

And in particular the following Directives: EN 1010 EN 60 204-1 EN 61 000-6-2, EN 61 000-6-3, EN 61 000-6-4

Assago , (MI) Italy

Page 7 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 8
Text on page 8

SAFETY

1.1 SYMBOLS OF SAFETY

In the manual some symbols are used to inform about dangerous situations for people and/or things.

The following symbols mean dangerous situations for people and/or things. If you don’t follow carefully the appropriate procedures, damages can occur to people and/or things and in extreme situations also fatal accidents. Together with the symbols it is written also what to do.

Attention – General danger!

Attention – Electrical voltage! Risk of electric shock.

Attention – Sharp blades! Risk of cut.

Attention – Hot surfaces! Risk of burn.

Attention – Risk of rolling parts! Risk of crushing.

Attention – Risk of moving chain! Risk of crushing.

Page 8 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 9
Text on page 9

In case of not warning of the symbols damages, also great, can happen to the machine and to the accessories.

1.2 SYMBOLS OF PROHIBITION AND OBLIGATORINESS

This symbol means a prohibition.

This symbol means an imperative.

This symbol means that it is mandatory to read in this manual information regarding specific topics (for ex. related to the specifications of the electric and pneumatic connection).

Page 9 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 10
Text on page 10

1.3 THE SAFETY DURING THE USE OF THE MACHINE

1.3.1 GENERAL

The manufacturer guarantees that the contents of this manual are in specification with the procedures required by the machine. The manufacturer therefore will be not responsible if the machine will be used in a different way.

1.3.2 SAFETY WARNINGS

Before the use of the machine, please read carefully the manual. Save the manual for further needs.

By apply different procedures, and not the specific procedures described in the manual, can produce operational problems. Please, read carefully the following Safety rules.

It is forbidden to use the machine when occurs one of the following situations: in explosive environment; in flammable atmosphere; in excessive durst environments.

Danger! Failure to comply with some or all the instructions listed in this manual could cause damage to the machine and / or personal injury. The manufacturer is not responsible for an arbitrary and improper use of the machine such as: Using the machine by untrained personnel; Use contrary to law; Incorrect installation; Defects in electrical power and / or pneumatic; Partial or total failure to comply with the instructions; Lack of maintenance and / or use of aftermarket parts; Changes or other actions not authorized by the manufacturer;

Page 10 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 11
Text on page 11

1.4 SAFETY CLOTHING

Clothing to use during the cleaning and /or maintenance operations

Eye protection against any spray of PUR glue or high temperature cleaner

Tight clothing, to avoid that they remain engaged with protruding parts. Long hair must be covered or otherwise collected by using e. g. a protective screen. Do not wear watches or jewels.

The safety clothing IS NOT INCLUDED in the machine and must be procured by the machine user.

The operator should wear clothing appropriate to the situation and specially during the following operations:

  • Maintenance
  • Replacing of the PUR glue
  • Cleaning of the PUR system

a) Eye protection against any spray of PUR glue or high temperature cleaner

c) Protective gloves for high temperature

Page 11 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 12
Text on page 12

1.5 INSTALLATION OF ELECTRICAL CABLES AND PIPES

Cables and pipes must be put inside of special cable channels to avoid the people to stumble and get hurt.

1.6 SAFETY EQUIPMENTS IN THE PERFECT BINDER

DANGER! It is forbidden to remove or render ineffective the safety guards for the safety of persons, and to tamper and / or modify, even partially, safety devices installed on the machine. In case of alarm signals due to the intervention of the safety, the operator must request the immediate intervention of technical people trained on the maintenance. The manufacturer is not responsible of any damage to persons or animals caused by tampering with the guards."

1.6.1 E MERGENCY BUTTON

It is located on the front, easily accessible from the operator's position.

In the diagrams the emergency button is identified 15S1

Activation state of emergency: the push- OFF state emergency stop: the button button must be pressed must be turned clockwise"

Page 12 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 13
Text on page 13

1.6.2 G REEN BUTTON FOR START CYCLE

The green button executes the command to start cycle, it means that the clamp closes and moves to the right, the mill if activated will run the cut, the glue will be applied, and if the press has been activated will crush the book; all this happens if I put the book block in the clamp and place a cover on the press.

1.6.3 SAFETY LIGHT CURTAINS

Two safety light curtains are placed at the ends of the binder.

In case of occupation of the work place during the production cycle, the machine stops instantly in a state of emergency, preventing and avoiding of shocking or crushing objects or hands or arms of the operator.

In the diagrams the SAFETY curtains are identified in the following way: Left SAFETY curtain 15SS2, right SAFETY curtain 15SS1

Page 13 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 14
Text on page 14

1.6.4 P ROTECTION PLATE OF THE MILLING STATION

An elastic cord exerts constantly on the The plate consists of a mobile plate that, ex- plate (F) a force (see arrows) that covers cept when the book block is moving, covers the mill disc. A sensor monitors and the the cutter in all operating conditions, even at cutter stops if the guard is opened, the a standstill. motor of the cutter is also equipped with a brake."

1.6.5 MAIN SWITCH

It is located on the left side of the machine.

The switch is open. The machine is off.

Position ON The switch closed. The machine on.

Page 14 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 15
Text on page 15

1.7 RISKS

There are risks that cannot be completely eliminated by either protective or as designed by the machine.

Area of the glue head.

Attention – Hot surfaces! Risk of burn. Use protective gloves.

Area of glue loading.

Attention – Hot surfaces! Risk of burn. Use protective gloves.

Area of the mill.

The disc contains several types of milling cutters. Use protective gloves, in case of removing the Notching Roughening or the brush.

Page 15 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 16
Text on page 16

1.8 PURPOSE

The machine is used to bind books using the following materials:

  1. Signatures, or sheet of paper (printed or not) for the block book
  2. Cardboard as cover of the book

Within the limits specified in the data sheet, included in this manual.

1.8.1 USES NOT PROVIDED , USES PROHIBITED

Any other use such as,

  • Milling / Roughening of book spines already binder ( Adhesive binder, stitching book, Sewing Book, etc.)
  • Use of materials other than those specified in a) and b)
  • Operations beyond the technical specifications are not to be regarded as intended use.

The user has the total responsibility of the damages to people or things due to an improper use, outside of their intended use.

Page 16 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 17
Text on page 17

2 TECHNICAL SHEET Digibook 300

Machine features: Cycle/Hour Spine length Workable height of the book Max. Cover size Workable thickness of the book Max. Cover Weight Control Screen Touch - Screen Copy Counter Memory of the jobs Diagnostic and Check Setting size, temperature control Speed Book Loading Adjustment of the clamp

300 mechanical cycles 100 – 450 mm 120 – 320 mm 710x460/240x110 mm 2 – 50 mm 500 g/m2

Yes Yes Yes Yes Yes Yes

Automatic, following the parameters introduced by the

Clamp opening Automatic, electrically driven Clamp closing Adjustable air Spine preparation Milling disks Ø 160 mm Notching Roughening for spine processing Brush for spine processing and cleaning Excludable mill Mechanical (with position control) Milling thickness 0 - 2.3 mm Chips aspirator Included in the machine Glue application system Tank PUR/Hot-Melt glue 3 Kg sealed Extrusion system of PUR/Hot-melt Integrated and sealed Extrusion head adjustment Automatic Side adjustment (used for signatures or wire stapling) Mechanical (high accuracy) Glue Stop Adjustable by Touch-Screen Cleaning / sealing Yes Press: Press Electro-pneumatic servo-controlled Adjustment Force / pressure, pressing time

Page 17 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 18
Text on page 18

Mechanical Adjustment Mechanical Adjustment Cover back bar adjustment Touch-Screen Cover loading

Automatic, driven by the parameters on the

Hand made by the operator

Length Width Height Weight

1850 mm 1090 mm 1370 mm 500 Kg

Page 18 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 19
Text on page 19

2.1.1 E LECTRICAL

Electrical power 400 V ±5%, 50 Hz, 3 ph + N + PE

Power of the machine

Protection fuses on the power network are duties of the customer

Distribution cabinet, customer side

16 A Differential protection class A 300mA

2.1.2 P NEUMATICS

Supply pressure The pneumatic system of the user must ensure, in the inlet connection of the compressed air in the perfect binder, the following values: Min.: 7 bar air consumption: 200 l/h

air quality:

Class 3

Pneumatic Characteristics of the machine

Compressed air consumption 200 l/h Calibration of input gauge 6 bar Min. working pressure 5.5 bar. If the pressure value falls below this value the machine enter in an “alarm” condition Diameter of air inlet 10mm The 10 mm diameter pipe for the connection to the compressor is not provided together with the machine. It is suggested the use of a compressor equipped with the automatic condensate drain, to avoid verify weekly if there is some water inside the compressor. It is suggested to use a silenced compressor, if the compressor is located inside the working plant.

Page 19 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 20
Text on page 20

Air quality provided to the Perfect Binder CLASS 3, DIN ISO 8573-1 Durst: 5 micron - 5 mg/m3 Water: -20°C

  • 0,88 g/m3 Oil: 1 mg/m3

The compressed air system upstream of the machine must be equipped with a dryer.

Periodically check the quality of the compressed air supplied to the machine and the operating values .

A IR QUALITY PROVIDED TO THE P ERFECT B INDER

To make work the pneumatic devices in an affordable, efficient and safe way, the compressed air supplied to the pneumatic device must have the following quality features: Pressure, Quantity, Water content, solids content, oil content.

DIN ISO 8573-1 – AIR QUALITY CLASS

The manufacturers of pneumatic components refer to the quality of compressed air to use on their products, referring to the table below.

The compressed air used in the industry contains water, oil, dust and other impurities. The interaction of these elements produces an aggressive mixture that can damage the compressed air devices and also the PUR glue contained in the PUR tank, the results will be a low quality production and increased maintenance costs.

Page 20 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 21
Text on page 21

3 ACCESSORIES

The standard composition includes:

  • Cleaning Kit
  • Start- up Kit

CLEANING KIT

Polizene green spatula (to remove excess glue or cleaner) Steel Wire 0.4" (for cleaning the channels of leakage of the lateral glue) Lamella thickness of 0.4 (for cleaning the slit of leakage of the spine glue) Spare Headless screws for the closure of the ducts Protective gloves Set of L wrenches

START-UP KIT

One pack of 2 kg of PUR Glue Henkel One pack of 2 liters of beans Cleaner- Blue Henkel

Page 21 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 22
Text on page 22

4 TRANSPORTATION

The Perfect Binder must be handled by a heaver. It can be got on all 4 sides, at the bottom of the frame are provided channels for the insertion of the forks.

For the final positioning or small movements can be used a trans-pallet. The machine can be raised by trans-pallet only in the 2 long sides, front and rear."

The image shows the location and size of the channels for the brackets for the transpallet and the forklift.

Page 22 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 23
Text on page 23

DANGER! For no reason the staff is authorized to pass under a suspended load during transport or in the proximity of. The producer is not responsible for what happens during this operation, to be carried out by qualified and authorized personnel, with the necessary individual safety protections (Suit, shoes, gloves, helmet, and glasses). Attention! The machine is balanced. In any case keep the forks low. In case of unbalance use weights. It is forbidden to hold by the hands the projecting parts. The machine and its parts must be protected from the weather outside. In particular, water, dust and moisture can oxidize certain elements of the machine, damaging them irreversibly. Follow the usual precautions to avoid falls and bumps.

IMPORTANT

  1. We do not provide tools for docking and lifting.
  2. The disposal of packaging materials will be provided by the recipient and must be conducted in accordance with the local regulations.
  3. Remove dust and dirt accumulated during the transportation.

Page 23 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 24
Text on page 24

5 STORAGE

The information contained in this section must be observed in case of temporary storage of the machine that may occur in the following situations:

Installation of the machine not immediately after its delivery. Uninstalling the machine. Storage awaiting a new location.

The machine must be stored and transported under conditions of SAFETY as shown in the table below.

Conditions of transportation and storage

Temperature average Humidity average Lighting Weather Space required

  • 5/+55°C 30/90% Adequate natural and / or artificial Adequate weather protection Adequate to allow the operations of lifting and carrying in SAFETY.

Horizontal ground plane Horizontal ground plane must have a capacity in excess of the total mass of the machine. In the case of removal or unused for long The damage caused by this failure periods (over 30 days), it is necessary to will void the warranty of the glue dedrain the glue system and to put inside vice. the protection cleaner. During periods of downtime you should The damage caused by this failure not open the tank containing the glue; will void the warranty of the glue deotherwise it accelerates the deterioration vice. creating serious permanent damage to the glue device. Protect with anti-corrosive products the parts subject to wear and work plans. Ref. to the section “maintenance”. Do not climb or place any objects on top of the machine

Page 24 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 25
Text on page 25

6 LAYOUT

7 POSITIONING AND WORKSPACES

Positioning: The Perfect Binder must be positioned so as to have a clear space around of at least 80 cm, and around the work area at least 150 cm. The room where the machine is installed must be properly ventilated with air change.

Page 25 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 26
Text on page 26

Workspaces Glue loading area

Glue loading area, the operator enter in this area to load the glue in the machine. Access area for the maintenance, for access to the electrical and pneumatic panel. Used to transit from the work area to the glue loading area. Operator’s work area during the normal use of the machine.

Transit area Operator’s work area Right side of the ma- It is not necessary to leave a space available. chine

Page 26 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 27
Text on page 27

8 INSTALLATION

8.1 TECHNICAL STAFF FOR THE INSTALLATION

The machine must be installed by people specifically trained and authorized by K.G.S. .

8.2 PHYSICAL CHARACTERISTICS OF THE AREA OF PLACEMENT

In addition to the overall dimensions of the machine given in the previous chapter, you must also meet the following conditions:

Near the area of placement of the machine should be arranged the sources of electric power and pneumatic following what is written in this manual. Provide sufficient space for normal use, maintenance of machinery, for any command and for additional equipments to connect. Refer to the draft in the chapter of the positioning.

The chosen site should not be close to deposits of flammable materials, or to operational sites that may create flammable or explosive atmospheres. For the installation you must choose an operational area depending on the size of the machine parts and lifting equipment selected, pay attention to the presence of any obstacles on the road (equipments, walls, etc.).

8.3 SUPPORT SURFACE

The machine requires no special foundations. It must be ensured the availability of an industrial floor. The producer has no responsibility about the enforcement of foundations (resistance calculation, thick reinforced concrete, etc.), which are under responsibility of the customer or company performing the design and construction of the foundations themselves. The Perfect Binder rests on four feet of 100 mm diameter.

8.4 WEATHER PROTECTION

The machine must be placed in a covered room, protected from direct contact with atmospheric agents.

Page 27 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 28
Text on page 28

8.5 LIGHT

To use and maintain in a safety way the machine a good light is needed. The room lighting should have a value that should allow normal operations without causing risks to the shadows.

8.6 ENVIRONMENTAL CONDITIONS

The values of temperature and humidity should be within the values in the table below. In case of use of the system in corrosive environments it is important to intervene in the maintenance of the machine with adequate time to avoid excessive wear of components.

Room temperature Relative humidity

MIN 5°C 20%

MAX 40°C 80%

Page 28 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 29
Text on page 29

8.7 ELECTRICAL CONNECTION

Electrical cable The end of the cable is prepared according to the destination of the Perfect Binder.

  1. With the European standard plug with protective earth (PE) mounted on a 3 meters length cable
  2. Cable length of 3 meters with sectioned end, with the earth conductor (PE) It is the responsibility of the user to adjust the connection cable in accordance with the applicable legislation.

8.7.1 G ROUND CONNECTION

The Perfect Binder is equipped with an earth conductor (PE).

During the installation the customer must realize the ground connection in accordance with the applicable legislation.

Page 29 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 30
Text on page 30

9 TRAINING OF THE OPERATOR

DANGER!

The operator must be trained about the operations to perform during the occurrence of possible faults, malfunctions or conditions of danger to themselves or others, and anyway he must perform the following procedures: Stop the machine quickly by pressing the emergency button (red button installed aboard of the machine herself); Do not carry out operations that go beyond the specific knowledge and techniques; Immediately inform their superior head, avoiding taking personal initiatives.

It is assumed that the operating and maintenance personnel possess the following minimum requirements:

  • Culture in general and specific enough, each to his ability, to read and understand the contents of the manual including the correct interpretation of drawings and diagrams, pneumatic and hydraulic;
  • Ability to understand correctly the symbols and video messages;
  • Overall knowledge of the machine and the plant in which it is installed;
  • Specific experience in the applied technology;
  • Knowledge on what to do in an emergency, the availability of personal protection equipment and how to use them.

Page 30 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 31
Text on page 31

10 POWER ON

  1. Be sure that the machine is correctly fed by air.
  2. Turn on the machine turning the general switch.
  3. Open the valve on the premelter
  4. Close the rear inspection panel.

On display you will see:

  • machine in emergency
  • machine with cleaner
  • machine not in temperature The red light is on
  1. Press once the green key, Green is blinking Orange is on Red is blinking On display:

Machine with cleaner Low temperature

  1. Exit from the alarms page using the arrow, in case the machine is equipped with the table to measure thickness, you must press “OK” to set to zero the table.
  2. When the temperature icon becomes green, press the green key. The machine sets to zero the axes.
  3. Press the key “glue cleaner” to load the glue.
  4. Set values for the book you are going to manufacture and press the green key. Orange light is on, the green one is blinking
  5. Put the book in the clamp, position the cover and press the green key. Once the book is completed, remove carefully the book and position a new cover and a book block. The machine will start again as soon as it will have:
  • The book in the clamp
  • The cover in the nipping station
  • Safety photocells free

Page 31 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 32
Text on page 32

10.1 FUNDAMENTALS

Pay Attention during the glue loading because of the high temperature, as indicated by the label, and use protective systems such as gloves. Never open the tank when it The moisture in the air would enter is cold. the tank and remain trapped, causing premature aging (curing) of the PUR glue and producing blockages and maintenance need. The machine can’t stay with The glue in contact with moist air the glue tank opened more modifies her composition, creating than 10 minutes if there is damages to the machine. PUR glue inside. The machine can’t stay with The PUR glue dries permanently; in the glue system empty for this case you risk permanent damage more than 2 minutes to the glue system. If you don’t have a glue cartridge available, put in the tank at least 500 grams of Blue and wait to be melted before to switch off the machine.

The tank has to be added with the same type and model of glue. You can use a different kind of glue only when the system is completely empty and cleaned by using the Blue-Cleaner.

Drain as much as possible the glue that you want to replace. Enter in the tank a quantity of about 600g of Blue-Cleaner and make it protrude from the main slot and the channel of the glue; if at the end of this cleaning cycle you are not sure that from the valve 100% Blue- Cleaner exits, repeat the operation.

Avoid opening the lid frequently, the moisture in the air damages the features and durability of the glue.

Page 32 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 33
Text on page 33

The depletion of the glue is found in two ways: the lack of glue on the book; issuing at the extrusion zone glue clear glue mixed with air vents and glue bubbles. When you finish the glue and insert a new cartridge you have to wait about 10 min before the new glue melts. The machine is not operational until the set temperature is reached.

Machine in emergency with auxiliary turned off Red light Machine on cycle with warnblinking ings Red light off Machine in emergency and without alarms on Orange light Machine with fed auxiliary on Orange light Auxiliaries turned on or off in blinking Orange light Auxiliaries turned off off Green light Machine on cycle on Green light Machine not on cycle blinking Green light Machine not ready off

Page 33 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 34
Text on page 34

10.2 ELECTRICAL CONNECTION

Make sure that the cable of the Perfect Binder is connected to electricity network with the specified features.

Turn on the main switch located on the left side of the machine, turn right to achieve the position 1= (ON).

10.3 PNEUMATIC CONNECTION

Connect the pneumatics performing the following procedure:

Connect the pipe (10mm external diameter) to the quick of the Perfect Binder.

Danger! Risk of collision due to uncontrolled movements of the pipes subjected to passage of compressed air.

Page 34 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 35
Text on page 35

DESCRIPTION OF THE GROUPS

Main switch open. The machine is off.

Main switch closed. The machine is on.

  1. CLAMP
  2. MILLING STATION

A Glue pressure regulator

Allows to adjust the amount of glue coming out of the extruder.

Approximate values Pressure = 0 lack of glue (don’t use) Pressure = 1.2 - 1.8 (books up to a 5mm) Pressure = 1.8 - 2 bar (books 5 - 10mm) Pressure= 2 - 3 bar (books 10 - 30mm) Pressure = > 3 bar (books 30 - 50mm)

B Press pressure regulator

Page 35 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 36
Text on page 36

Allows to adjust the press force on the book side Pressure = 0 - 2 bar min. force Pressure = 3 bar med. force Pressure = 5 bar max .force

C Milling height regulator

Allows to adjust the milling (in mm) position = 0 only notching position = 0.5 - 1 the best milling and notching situation position = 2.3 max. milling and notching

1) CLAMP

2) MILLING STATION

3) GLUE SYSTEM

D) Exclusion lever for the Milling Sta-

tion group Lever in position ON = working Lever in position OFF = off, and lowered.

  1. PRESS

M) Cover squaring adjustment

Page 36 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 37
Text on page 37

On the back Gate access to the tanks. The machine moves only with the door closed.

  1. GLUE TANK
  2. CLEANER TANK L) Glue pressure tap
  • - closed | open
  1. Chips aspiring tube

Page 37 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 38
Text on page 38

10.5 CHIPS ASPIRATOR

The chips aspirator is located inside the cabinet of the Perfect Binder and is electrically connected to the Perfect Binder herself. When the Perfect Binder is delivered, the chips aspirator is ready, mechanically (aspiration tube) and electrically connected, he switches on and off together with the Milling Station.

Front picture: chips aspirator (see the arrow)

Switch Aspiration tube It must be in “on” position (I = ON) In the back of the Perfect Binder, connectduring the operation of the Perfect ed to the back preparation station. Binder.

Every day the chips aspirator must be emptied and cleaned to be

Page 38 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 39

Page 39 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 40
Text on page 40

10.7 PUR TANK OPENING AND CLOSING, AND GLUE LOADING.

10.7.1 O PENING OF THE PUR TANK

To access the glue tank it is necessary to open the sliding door provided with handle. The opening of this protection put the machine in a state of emergency and reduces the pressure of the glue tank while the Cleaner tank remains at a pressure of 2 Bar. The machine can’t work with the back door open.

WARNINGS ON THE OPENESS OF PUR TANK

Wear hand protection, all parts are at high temperatures.

Never open the tank while it is COLD. The air moisture would enter and remain trapped in the tank causing premature aging (curing) of the PUR glue with probable clogging and maintenance need. Avoid to open the PUR tank with no reason.

Limit the opening time. Close the tank as soon as possible

Follow carefully the sequence below.

Open the sliding door in the back of the machine, provided with an handle. The machine goes into a state of emergency and takes away the pressure to the glue tank, while the cleaner tank remains under pressure of 1 bar.

Page 40 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 41
Text on page 41
  1. Loosen the lock knob. Turn it counter clockwise.

Attention! High temperature! Wear protective gloves.

  1. Tilt locking knob to its rest position. The cover is so free to open.
  2. Lift the lid to its fully open by grasping the lateral knob.

Page 41 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 42
Text on page 42

10.7.2 PREPARATION AND LOADING OF THE PUR GLUE

Take a bottle of glue and verify the integrity of the aluminum color pack, and make sure that the expiration date printed in the package is not over

Please read the SAFETY cards of the used glue, and follow all the instructions of the manufacturer. Cut the foil, by using a sharp tool.

Remove completely the foil.

Insert the cartridge into the tank. Attention! High temperature! Use protective gloves.

Page 42 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 43
Text on page 43

Remove the knob, paying attention to high temperature components. Turn the knob clockwise vigorously to tighten the tank.

Close the sliding door in the back of the machine, provided with an handle.

Page 43 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 44
Text on page 44

10.7.3 C LEANER LOADING

Open the sliding door in the back of the machine, provided with an handler. Attention! High temperature! Use protective gloves. .

Read carefully the SAFETY cards of the used cleaner, and follow all the instructions of the manufacturer. By loosening the knob of the cleaner tank you will notice an air leak, this is normal as the machine continues to provide air to the tank.

Fill the tank with cleaner to about 3 / 4 of its volume by using a small container.

Replace the cover using the knob on the side and pay attention to the high temperature components. Lift the locking knob.

Page 44 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 45
Text on page 45

Tighten the knob until the noise of escaping air disappears.

Close the sliding door in the back of the machine, provided with a handle.

Page 45 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 46
Text on page 46

11 FUNCTIONS OF THE PERFECT BINDER

11.1 START UP PAGE

  • Selector for the book type
  • Front glue stop
  • Rear glue stop
  • Cover set
  • Book thickness

Optional: Thickness detection for the book. Position a book onto the measurement table and press the key, the machine will modify the clamp dimension and also the dimensions of the glue station.

Page 46 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 47
Text on page 47

Selector for permanence time of the book in the clamp.

Management page for working JOB. Go to

Speed selector 1-2-3

Alarms It will blinking red in case there are alarms or warnings.

Glue station set up See page 54

Nipping station set up

Page 47 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 48
Text on page 48

Cleaning procedure with CLEANER or GLUE loading

Groups status bar If red, turned off If yellow, value modified in the advanced set up

Status bar. 1 book in the clamp 2 milling station 3 glue station 4 cover

Page 48 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 49
Text on page 49

11.1.1 DISPLAY FOR PRODUCTION METERS

Meter of total production Meter showing items produced during the life of the machine. It is not possible to reset it.

Meter of partial production Meter showing the items produced by the machine. It is possible to reset it with the Reset key.

Meter of produced items Meter showing the items produced during the current day. It is possible to reset it with the Reset key.

Items to be produced Meter showing the items to be produced. Press the blue key and enter the desired quantity.

Page 49 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 50
Text on page 50

12 ALARMS PAGE

List of Warnings and Messages :

Air pressure fault to the machine. Check valve or current pressure that supplies the line.

Auxiliary fault. Verify that the emergency button is not pressed or that the SAFETY barriers are not engaged with the machine on cycle or in movement.

Drive milling station error

Driving error for Milling Station engine control.

Drive nipping station error

Driving error for Nipping station engine control.

Driving error for carriage engine control.

Rear glue panel open

Rear panel for loading/inspecting glue tank open.

Glue station not ready

Glue station (premelter and head) not ready to move. In this case it is not possible to perform any function that directly depends on head movement.

Page 50 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 51
Text on page 51

It requires to start a cycle with a book in the nipping station. If there is no book, verify if the cover is perfectly aligned to the nipping station and does not accidentally shroud the sensor for book presence.

Book in the nipping station

It requires to start a cycle, but there is no cover on the nipping station.

Verify book in the clamp

It requires to start a cycle but there is no book pack the clamp.

Inability to perform PRESET. temperature not reached

It is not possible to position the machine because the glue station is not ready. Wait for heating.

Glue head not in position

The glue head is in a lower position compared to that one set to allow the passage of the book.

It requires a set to ZERO

The head is locked in a manual standby.

Active cleaning cycle for the head

Active cleaning cycle for the head

Set up for the axis

Request for positioning the machine in order to start the cycle

The lever for excluding the milling disk was Milling station off, set the jogger to lowered, it is necessary to lower the grip ZERO trimmer to the ZERO position.

Milling station not in position

The lever for excluding the milling disk is not in an acceptable position UP or DOWN.

Cleaner into head, load glue

At shutdown of the machine the head cleaning has been made with the automatic cycle of the cleaner. Eject the cleaner and load the glue.

Page 51 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 52
Text on page 52

13 PARAMETERS FOR SINGLE AXES (GROUPS)

Standard symbols that you will find in the following pages.

Access to manual movement page

Group movement in the direction indicated by the green arrow. If you push the green arrow, the dimension increases.

Group movement in the direction indicated by the red arrow. If you push the red arrow, the dimension decreases.

The value in blue can be modified by the operator. The value in green can be modified by the operator

Page 52 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 53
Text on page 53

13.1 PARAMETERS FOR NIPPING STATION/CARRIAGE

Offset for carriage position

+ 5mm

  • 5mm

Offset for the arrival position of the carriage onto the nipping station. This allows to position the book rightmost (positive value) or more left (negative value) compared to cover. Entering zero value (0) the book will be aligned to the cover.

Manual movements for the nipping station

Page 53 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 54
Text on page 54

13.2 PARAMETERS FOR THE HEAD OF THE GLUE STATION

Management for working parameters of glue station head

Temperature control for premelter Current temperature for premelter Temperature control for the glue head Current temperature for glue head Stand by

The temperature must be set on the basis of the glue type you are going to use. Refer to temperatures suggested by glue producer.

The premelter temperature must be kept from 5° to 15 ° less than that the extrusion temperature. During the heating, the indicators will be red and the machine will show the message

Page 54 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 55
Text on page 55

“Glue station not ready”. When the detected temperatures correspond to the fixed temperatures, the indicators will be green. So the machine will start to move the glue station while it waits for stabilizing the temperatures. At the end of this process the machine will be ready to start.

The standby status will decrease the temperatures of 30° If the machine does not produce any book for more than 30 minutes, the machine automatically goes into standby

The head for the extrusion is closed The temperatures decrease of 30° in order to protect the glue from unnecessary prolonged heating.

To go back to normal condition press the display. After that, you have to wait for glue station to reach the fixed temperature. When the temperature is correct, it will be possible to position the axes and proceed with book production.

Page 55 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 56
Text on page 56

13.3 PARAMETERS FOR NIPPING STATION

Management of working parameters for nipping station

From 0mm to 1.8mm

Tune the distance of the spine plate to the book.

Page 56 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 57
Text on page 57

13.4 CLEANER AND GLUE LOADING

See chapter 19 and 21.

Page 57 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 58
Text on page 58

14 . ACCES TO ADVANCED SET UP PAGES

Page 58 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 59
Text on page 59

14.1 NIPPING STATION SET UP

Nipping station with a standard set up

Nipping station with a set up for a sewing book, it widens more when you position the book.

Page 59 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 60
Text on page 60

14.2 MILLING STATION SET UP

Release of the engine braking on the nipping station, it only works when the emergency button is pressed.

Page 60 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 61
Text on page 61

14.3 GLUE HEAD SET UP

Manual operation for glue station:

Glue spillage Doing one push, you move the pins. Hold the key, it spills the glue.

With this key it is possible to activate cleaner spillage.

Offset compared to the default value.

Page 61 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 62
Text on page 62

14.4 NIPPING STATION SET UP

Nipping station not active

Offset compared to the default value.

Page 62 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 63
Text on page 63

15 MANAGEMENT PAGE FOR WORKING JOB

15.1 MANAGEMENT OF THE JOBS

It is possible to save until 100 working JOBS.

Using the green and red arrows pick a free page and hold the key “SALVA DATI” to save

the set up you have used to manufacture the current product. In addition to that it is

possible to complete the JOB adding all the information you need inside the green

boxes. After you have completed the green boxes, save the JOB.

Page 63 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 64
Text on page 64

Using the arrows UP and DOWN pick the page with the desired JOB and hold the key

“CARICA DATI”. The machine will update all the positions of the automatic axes. It is

necessary to manually operate for manual settings.

Page 64 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 65
Text on page 65

16 GLUE RECOVERY PROCEDURE

The glue recovery procedure must be performed every time the machine has been switched off by using the procedure “End of job”. If the machine has been switched off by using the procedure “End of job”, it will be impossible to start again to work without the glue recovery procedure; an error message will be displayed: cleaner error in the glue group. Primary condition:

  • machine in temperature
  • tank valve open, vertically.

BUTTON

for a few seconds to start the glue recovery process

The head of the glue group opens.

Page 65 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 66
Text on page 66

Remove the headless screws using the L wrench and take the manometer of the glue at pressure 1 bar

Press the button OK

Press the button “ANCORA COLLA” until the traces of Blue cleaner disappear. Help the glue to exit from the bin by using the green spatula.

Clean carefully all the excess spillage using the spatula and paper towels

Replace the headless screws using the Lwrench provided (beware of temperature), press OK. Attention! Headless screws max. protrude 1 mm

Page 66 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 67
Text on page 67

Now the machine is ready to work.

Page 67 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 68
Text on page 68

17 COVER POSITIONING

The parameter shows the cover position.

The value indicates the X dimension.

Position the cover manually as shown by the arrows.

Page 68 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 69
Text on page 69

The standard calibration requires that the angle between the sides of the cover is 90 °

The standard calibration requires that the angle between the sides of the cover is 90 °.

If the cover has some problems caused by improper trimming, you can adjust the placement by adjusting the position of the eccentric on the operator side.

Page 69 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 70
Text on page 70

Preparation of the machine to produce a book.

CONTROLS TO PERFORM BEFORE STARTING THE JOB

Before to use the Perfect Binder perform the following controls:

The operator must have read and understood this manual, including the important information concerning the SAFETY.

Make sure you have appropriate clothing to work and, if necessary, also safety clothing.

Ensure that the Perfect Binder is properly powered and connected to ground (PE)

Ensure that the pneumatic system of the Perfect Binder is properly fed and if the main switch oh the factory is open.

Verify that the chips aspirator is connected to the Perfect Binder and its power switch is in position 1 = ON.

Check that in the tank there is a minimal amount of glue to allow to process several books, otherwise insert a new cartridge of glue inside the tank.

Glue collection tank flushed.

Ensure that the Perfect Binder is clean and without books or covers, especially: Clamp, Silent Plate, Milling Station, PUR head, Press.

Check that the temperature settings are correct for the used glue and that have been achieved the correct values to work. Refer to the technical sheets of the glue/cleaner manufacturer.

Verify that the values of temperatures have reached their work values. Both temperature indicators must be lit.

If necessary, remove the layer of Blue-Cleaner from the PUR head.

Page 70 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 71
Text on page 71

Switch on the machine using the main switch. Turn the switch to the position ON.

Verify that the pressure in input, displayed on the input manometer, is correct. MIN 6 BAR

Open the valve on the pre-melting unit: The valve with the lever in vertical position indicates that it is open.

Verify the preset temperatures. Wait for warm-up phase. At the end of warming up the machine is running a series of cycles of opening and closing of the glue valve. Perform the procedure of glue restoring.

To produce a milled book, please adjust the milling depth. To produce a not milled book, please use the lever for lowering the milling unit.

Page 71 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 72
Text on page 72

Insert the parameters of the thickness of the book, cover, front and rear glue stops. Select the desired speed Perform a general reset Perform an axis positioning Adjust the pressure of the glue Adjust the pressure of the press Place the cover over the press, placing it at the left fixed reference and the adjustable reference in the bottom of the press

Load the booklet in the clamp as shown by the arrow in the figure

Press the Start Button The machine will close the clamp, and this will begin to move through the Mil-ling Station and the glue unit, when the position will achieved the press will apply the cover, and during the time of pressing the clamp will go back. When the yellow light will be lit is will be possible to withdraw the book.

Page 72 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 73
Text on page 73

18 CLEANING THE MACHINE

When the machine work using PUR glue, it is imperative and essential an accurate cleaning of the glue. The dried glue is no more refundable. Residue of glue during the drying process can cause blockages or a uneven extrusion of the glue. The glue group must be kept clean with the deposits of glue, PUR glue residues harden over time and cause damages to the equipment.

Performing the “End of job cleaning” it is possible to save the machine turned off containing PUR glue for 2 weeks.

COMPULSORY CLEANING for proper operation of the machine.

"If the machine is switched off or unused for more than 120 minutes it is necessary to make the cycle of "End of job cleaning".

EVERY DAY:

END OF JOB CLEANING

EMPTY THE CHIPS ASPIRATOR CLEANING SIDE EXTRUDER CLEANING SPINE EXTRUDER CLEANING DETAILS

ONCE IN THE WHEEK:

In case of:

Some pages are not glued The glue on the side is not uniform

Perform the spine extruder cleaning Perform the side extruder cleaning

Page 73 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 74
Text on page 74

18.1 PROCEDURE TO CLEAN THE SPINE GLUE EXTRUDER.

Press the Button “Manual move-

Press the key dedicated to the

Press reset to open the head up

to the reset position

Page 74 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 75
Text on page 75

Insert the calibrated blade into the slot extrusion to touch the bottom and move it along the slot to remove or release any possible obstructions.

Adjust the value of the glue extrusion pressure to 1bar.

Hold the key “FUORIUSCI- TA COLLA” for few seconds until you do not see the glue spilling.

Verify that the glue extrusion is uniform; otherwise, insert the calibrated blade and repeat the cleaning operation.

The tank pressure will turn off after some minutes of inactivity.

Page 75 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 76
Text on page 76

Thoroughly clean the blade. When the glue is fully cured the blade will no longer operate.

18.2 PROCEDURE TO CLEAN THE GLUE SIDE EXTRUDERS.

Press the key dedicated to the

Page 76 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 77
Text on page 77

Press reset to open the head to

The glue smeared on the side of the book is extruded through 3 small channels located on the plates containing the book.

To get a correct extrusion of the side glue you must remove the headless screw and insert in the holes the included wire

Page 77 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 78
Text on page 78

To get a correct extrusion of the side glue you must remove the headless screw and insert in the holes the included wire.

Pass the thread also in the main conduit until you enter into the below slot.

Be careful. When you replace the headless screws, they cannot protrude otherwise you cause a collision with the nipping station. Attention! Headless screws max. protrude 1 mm

Page 78 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 79
Text on page 79

18.3 “END OF JOB” CLEANING

To switch off the machine at the end of the day you must eject the remaining glue inside of the extruder. To do it you must activate the automatic procedure that allows executing a safety off. Hold for a few seconds the BUT-

TON to start the procedure. During this phase the glue group opens and the glue starts to exit. Use the green spatula included and make the glue to flow in the collection tank. Try to remove as much as possible of the released glue.

Press OK Remove the headless screws using the included L wrench (Pay attention to the temperature).

Page 79 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 80
Text on page 80

Press “Ancora Cleaner” until from the extruder exits only cleaner.

Press OK Screw the headless screws using the same included L wrench (Pay attention to the temperature).

The machine is now ready to be switched off..

Close the back valve.

The valve is closed when in horizontal position.

Page 80 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 81
Text on page 81

18.4 DETAILS CLEANING

Press the Button “manual move-

Press the head key

Press reset to make the head open to the reset position.

Page 81 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 82
Text on page 82

Adjust the glue extrusion pressure to 1 bar.

Use the included blade to remove all the visible glue traces.

Page 82 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 83
Text on page 83

If necessary you can use liquid solvents to get a better cleaning of the surface.

During the use of liquid solvents refer to the safety instructions provided by the solvent manufacturer.

Clean carefully all the used tools, otherwise they become unusable later.

Page 83 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 84
Text on page 84

19 Problems - Solutions

19.1 CHIPS ASPIRATOR – LESS VACUUM:

  • Verify that the plexiglass inspection, located on the Milling Station, is free.
  • Verify that the chips aspirator tank is empty.
  • Verify that the chips aspirator tube is not full of chips.
  • Verify that the aspirator filter is clean.

19.2 CLAMP – IT DOES’T START:

  • Verify the presence of a book.
  • Verify that the emergency switch is disabled.
  • Verify that the barrier light is completely free.
  • Verify that the book detecting photocell and the related reflector are clean.
  • Verify that the photocell or the reflector of the press is free from books, pieces of paper or durst.
  • Verify that the clamp jaws are free from glue residues.
  • Verify the air pressure in the machine.

19.3 IRREGULAR GLUE START / STOP :

  • Clean the photocell and the reflector positioned between the silent plane and the Milling Station.

19.4 MILLING STATION – IRREGULAR CUT AND NOTCHING:

  • Verify that the Milling disk is not broken or damaged. This could happen by the management of books already bound with glue (TO AVOID).

19.5 COVER PLATE MILLING STATION – IT DOES’T OPEN / CLOSE CORRECTLY:

  • Remove the 4 screws by using an wrench 4. Remove the cover plate Milling Station releasing the strap. Clean inside of the milling station box.
  • Shorten the strap by a node close to the interior of the Milling Station box, increasing the strength of the plate closure.

19.6 HEAD - OUT OF TOO MUCH OR LITTLE GLUE:

  • Verify the air pressure of the glue group.
  • Verify that the head shutter is free, using the provided blade.
  • Verify that the side holes are free, using the provided steel wire.
  • Verify that the injectors are working properly (they must move back and forth 3-4 mm).
  • Verify the glue presence in the tank.
  • Verify that the glue in the tank is not hard-glue.
  • Verify that the tank valve is open.
  • Verify the position of the internal lateral jaw: it must be 0.10 tenths back from the edge of the clamp.

Page 84 of 85

Morgana DigiBook 300XL Pro Automatic PUR Perfect Binding Machine Instruction Manual, page 85
Text on page 85

Verify the head height: if it comes out a little glue lower the head and increase the air pressure of the glue group, if it comes out to much glue raise the head and lower the air pressure of the glue.

PRESS

  • Press so much: lower the air pressure of the press group or the spine height.
  • Round spine: increase the press height.
  • Edge pinched: contact technical support.
  • Not uniform spine: contact technical support.

Page 85 of 85 ยท End of manual

Quick start

  1. Have K.G.S.-authorized staff install the binder on an industrial floor with at least 80 cm clear around it and connect power and compressed air.
  2. Turn on the main switch on the left side of the machine.
  3. Load PUR glue: check the pack and expiry date, cut away the foil and insert the cartridge with heat-protective gloves. Fill the cleaner tank to about 3/4.
  4. Set the glue pressure for book thickness (about 1.2-1.8 bar up to 5mm, 1.8-2 bar for 5-10mm, 2-3 bar for 10-30mm, over 3 bar for 30-50mm).
  5. Set the press pressure (0-2 bar min., 3 bar medium, 5 bar max. force) and milling height (0.5-1 mm gives the best milling and notching).
  6. Place the book block in the clamp and a cover on the press, then press the green button to start the cycle.
  7. If the machine will be off or unused for more than 120 minutes, run the End of job cleaning cycle.

Troubleshooting

ProblemLikely causeFix (from the manual)
Chips aspirator has less vacuumBlocked inspection window, full tank or tube, or dirty filter.Check the plexiglass inspection on the milling station, empty the aspirator tank, clear the tube and clean the filter. Page 84
Clamp does not startNo book, emergency switch engaged, light barrier obstructed, dirty photocells, glue on jaws or low air pressure.Check for a book, release the emergency switch, clear the light barrier, clean the photocells and reflectors, clean the jaws and check air pressure. Page 84
Irregular glue start/stopDirty photocell or reflector between the silent plane and the milling station.Clean that photocell and reflector. Page 84
Irregular cut and notchingBroken or damaged milling disk, for example from milling books already bound with glue.Inspect the milling disk and never process glue-bound books. Page 84
Milling station cover plate does not open or close correctlyDirt inside the milling station box or a loose strap.Remove the 4 screws and the cover plate, clean inside the box, and shorten the strap by a knot to increase closing force. Page 84
Head applies too much or too little glueWrong glue air pressure, blocked shutter or side holes, faulty injectors, empty or hardened glue, or closed tank valve.Check air pressure, clear the shutter with the blade and side holes with the steel wire, check injectors move 3-4 mm, check the glue and open the tank valve. Page 84

Frequently asked questions

What book sizes can the DigiBook 300 bind?

Spine length 100-450 mm, book height 120-320 mm, thickness 2-50 mm, covers up to 710 x 460 mm and up to 500 g/m² (page 17).

How fast is the DigiBook 300?

300 mechanical cycles per hour (page 17).

What glue pressure should I use?

Approximately 1.2-1.8 bar for books up to 5mm, 1.8-2 bar for 5-10mm, 2-3 bar for 10-30mm and over 3 bar for 30-50mm. Never run at 0 (page 35).

How big and heavy is the DigiBook 300?

1850 x 1090 x 1370 mm and 500 kg (page 18).

How long can PUR glue stay in the machine when it is off?

After the End of job cleaning, the machine can be left off containing PUR glue for 2 weeks (page 73).