Discontinued Boards
Discover a versatile selection of high-quality display and presentation boards designed to enhance collaboration and organization in any office, classroom, or creative space. Featuring innovative designs like the Easel and IdeaWall with double-sided, magnet-compatible whiteboard surfaces, these boards offer maximum functionality for brainstorming, planning, and presentations. The Caddy Kit and Collaboration Kit models include multiple tablets and X-Pegs, providing dynamic tools for group work and interactive sessions. Ideal for professionals, educators, and teams seeking practical and durable solutions, these boards combine style and utility to boost productivity. Backed by a 10-year manufacturer warranty, you can trust in their long-lasting performance. Shop at MyBinding.com for competitive pricing, fast shipping, and exceptional customer service, ensuring you get the best value and support for your display and presentation needs.
Discover a versatile selection of high-quality display and presentation boards designed to enhance collaboration and organization in any office, classroom, or creative space. Featuring innovative designs like the Easel and IdeaWall with double-sided, magnet-compatible whiteboard...
Discover a versatile selection of high-quality display and presentation boards designed to enhance collaboration and organization in any office, classroom, or creative space. Featuring innovative designs like the Easel and IdeaWall with double-sided, magnet-compatible whiteboard surfaces, these boards offer maximum functionality for brainstorming, planning, and presentations. The Caddy Kit and Collaboration Kit models include multiple tablets and X-Pegs, providing dynamic tools for group work and interactive sessions. Ideal for professionals, educators, and teams seeking practical and durable solutions, these boards combine style and utility to boost productivity. Backed by a 10-year manufacturer warranty, you can trust in their long-lasting performance. Shop at MyBinding.com for competitive pricing, fast shipping, and exceptional customer service, ensuring you get the best value and support for your display and presentation needs.
Filter
features
- Soft, suede-gripped eraser with urethane foam for superior chalk absorption and cleaning power
- Safe for daily use on all chalkboard surfaces to eliminate need for frequent board washing
- Ideal for heavy-use classroom environments and large writing surfaces
- Features durable wood construction
features
- Use on almost any dry interior surface.
- Sheet Quantity: 10 Sheets
- Film Size: 24" x 32"
- Color: White with blue grid lines
features
- Size: 3' x 2'
- Surface Material: Glass
- Frame Material: None
- Magnetic: Yes
features
- Chalk eraser with six strips of dense eraser felt on strong felt backing for excellent chalk absorption and cleaning power
- Safe for daily use on all chalkboard surfaces
- Ideal for moderate-use classroom environments and common work spaces
- Size: 5" x 2" x 1"
features
- Size: 12" x 12"
- Surface: Magnetic Dry-Erase
- Surface Design: Chore Chart
- Color: Assorted
features
- Size: 4' x 6'
- Surface Material: Chalkboard
- Frame Material: Anodized Aluminum
- Magnetic: No
features
- Size: 4' x 3'
- Surface Material: Painted Steel
- Frame Material: Plastic/Aluminum
- Magnetic: Yes
features
- Capacity (Volume): 8 oz.
- Whiteboard spray cleaner pH balanced formula is made using plant-based ingredients.
- Removes dry-erase ink, dust and dirt from all whiteboard and dry-erase surfaces.
- Cleaner is readily biodegradable, non-toxic and low odor (SDS available upon request).
features
- Board Size: 12" x 12"
- Frame Style: Frameless
- Surface Color: White
- Surface Type: Glass
features
- Color: Silver
- Dimension: 6 1/2"L x 2"W x 1 3/8"H.
- Felt pad effectively erases chalk or dry-erase ink and is reversible. Flip the pad for a brand new start.
- Quality eraser for chalkboards and whiteboards keeps your writing surface clean.
features
- Attractive 3/4" magnetic letters create well-aligned, easy-to-read messages on Quartet magnetic letter boards
- Proportionally spaced letters with molded grooves align straight and even for precise communication
- Bold, raised white lettering in Helvetica font makes an impact on black backgrounds
- Set includes 128 characters
features
- Size: 3' x 4'
- Surface Material: Porcelain
- Frame Material: Anodized Aluminum
- Magnetic: Yes
features
- Frame is white powder-coated steel
- Ideal for any early childhood learning environment
- Includes 2" locking casters
- Folds for compact and convenient storage
features
- 1-month calendar with dry-erase surface.
- Ideal for occasional use at home, work or school; Reuse month after month to stay organized year round.
- 14" x 14" size board fits just about anywhere.
- Assorted Color
features
- Capacity (Volume): 17 oz.
- Whiteboard spray cleaner pH balanced formula is made using plant-based ingredients.
- Removes dry-erase ink, dust and dirt from all whiteboard and dry-erase surfaces.
- Cleaner is readily biodegradable, non-toxic and low odor (SDS available upon request).
features
- High-powered magnets in the shape of push pins fasten to any magnetic surface to securely hold up to 6 pages, creating an instant bulletin board
- Convenient, clear plastic package stores all 20 push pins
- Accent messages with brightly colored red, blue, green, yellow and purple plastic magnets
- Round translucent tops add stylish touch to this functional tool
features
- Constructed of ABS gray resin for a lightweight easel.
- Holds up to 25 pounds yet weighs just 3 pounds.
- Adjustable to 37" table top or 62" full size.
- Features permanently positioned board holders, retractable legs and non-marring feet.
features
- Powerful cleaning and low odor make these manicure safe wipes perfect for the office and classroom.
- Tough on grime, but won't damage boards or fingernail polish.
- Has a 3-ply construction features a plastic barrier layer that keeps ink off your fingers.
- Packaged in convenient 50-count pop-up canister.
features
- Size: 48" x 1"
- Surface Material: Cork
- Frame Material: Aluminum
- Includes easy-to-use mounting hardware and pushpins
features
- Magnetic dry-erase combo board provides 2-in-1 functionality.
- 11" x 14" board with black plastic frame.
- Dry-erase marker and magnets are included.
- Quantity: 1
features
- Cleans, conditions, and restores marker board surfaces by removing ink stains and cleaning surface
- Non-toxic and AP-certified
- Specially formulated for marker boards
- Quantity: 1
features
- Premium felt chalk eraser offers superior chalk absorption and cleaning power
- Safe for daily use on all chalkboard surfaces
- Ideal for heavy-use classroom environments and common work spaces
- Size: 5" x 2" x 1-1/4"
features
- Size: 3' length
- Accessories: Screws, magnets, or double-sided adhesive tape
- Magnetic: Yes
- Quantity: 6pk
features
- Size: 1"
- Surface Material: precision grooved letterboards
- Frame Material: N/A
- Magnetic: No
Showing 48 of 1875 products
