Discontinued Boards

Compare discontinued display, presentation, collaboration, and writing surfaces with currently available options from the broader Boards collection. Discontinued Boards includes double-sided magnetic whiteboards, easel-style boards, collaboration kits, and other presentation solutions, while the broader Boards collection includes whiteboards, bulletin boards, chalkboards, combination boards, conference room boards, lap boards, modular boards, easels, and other communication and display surfaces.

Discontinued Boards

Compare discontinued display, presentation, collaboration, and writing surfaces with currently available options from the broader Boards collection. Discontinued Boards includes double-sided magnetic whiteboards, easel-style boards, collaboration kits, and other presentation solutions, while the broader Boards...

1867 Results
Show: | |
Quartet

features

  • Super bright light and outstanding long life.
  • Material: 99% pure quartz glass
  • GBC Quartet Part Number: VA-FNT-6
  • Quantity: 1 Lamp
Quartet

features

  • Super bright light and outstanding long life.
  • Material: 99% pure quartz glass
  • Part Number: VA-ELH-6
  • Quantity: 1 Lamp
Best-Rite

features

  • Size: 4' x 10'
  • Surface Material: Cork
  • Frame Material: Anodized Aluminum
  • Magnetic: No
Ghent

features

  • Size: 4' x 12'
  • Surface Material: Painted Steel
  • Frame Material: None
  • Magnetic: Yes
Wizard Wall

features

  • 4 different size and color combinations
  • Reusable and repositionable
  • Use permanent or dry erase markers
  • Universal application
Wizard Wall

features

  • Choose between a 2 pack and a 6 pack
  • 15 sheets of reusable ClingZ film
  • Use permanent or dry erase markers
  • Universal application
Flipside

features

  • Sizes: 12" x 18" or 20" x 30"
  • Surface Finish: Gloss
  • Surface Material: Foam
  • Surface Color: White
Quartet

features

  • Board Size: Varies
  • Frame Style: Frameless
  • Surface Color: White
  • Surface Type: Glass
Quartet

features

  • Mini mail organizer keeps all mail neatly in one location.
  • Magnetic backing allows you to attach organizer to magnetic whiteboard or any other metal surface.
  • 3.25" x 3.494" x 0.714".
  • Color: Black, White or Charcoal
Quartet

features

  • Board Size: Available in 5 different sizes
  • Frame Style: Frameless
  • Surface Color: White
  • Surface Type: Glass
Quartet

features

  • 4 popular sizes.
  • Translucent frame.
  • Includes attachable tray and 1 marker.
  • Flexible mounting system.
Quartet

features

  • Available in 3 different sizes
  • Simple mounting system
  • Comes with accessories
  • 20 year warranty
Quartet

features

  • 4 popular sizes.
  • Connectable modular board.
  • Magnetic porcelain white board surface.
  • Mahogany finish frame.
Quartet

features

  • Available in 4 different sizes
  • Six strips of dense felt
  • Ideal for moderate use
  • Felt backing holds together
Quartet

features

  • Available in 1/2" and 1"
  • White plastic
  • Helvetica font
  • Set includes 144 letters, numbers, and symbols
Quartet

features

  • Available in 4 different sizes
  • Glare-reducing frosted plastic overlay
  • Unhinged frame edges
  • Ideal for high traffice signage
Quartet

features

  • Available in 12"x18" and 9"x12" sizes
  • Includes marker with eraser
  • Stands up to constant use
  • Ideal size for a Childs hands or lap
Quartet

features

  • 2 popular sizes.
  • Constructed from wood with natural finish.
  • Other accessories available.
  • Ideal for heavy usage
Quartet

features

  • Available in 2 different sizes
  • Indigo blue fabric covered bulletin
  • Rounded edges
  • Simple mounting system
Quartet

features

  • Ebony, Walnut, and Oak finishes
  • Convenient 70" freestanding storage
  • Brass-plated metal hooks
  • 2-piece base
Quartet

features

  • Available in 2 different sizes
  • Self-healing fabric bulletin surface
  • Includes magnetic marker tray and 4 assorted Quartet dry-erase markers
  • Doubles as room divider to enhance privacy
Quartet

features

  • 12" and 18" sizes available
  • Self-healing surface
  • Includes easy-to-use mounting hardware
  • Rounded-corner ebony putty frame
Quartet

features

  • 36" and 48" sizes available
  • Holds up to 12 hangers
  • Perforated top shelf provides additional storage
  • Attractive black steel
Quartet

features

  • 36" and 48" sizes available
  • Holds up to 12 hangers
  • Perforated top shelf provides additional storage
  • Single-sided 36" x 61.5" freestanding hanging solution

Showing 1800 of 1867 products