Discontinued Boards

Compare discontinued display, presentation, collaboration, and writing surfaces with currently available options from the broader Boards collection. Discontinued Boards includes double-sided magnetic whiteboards, easel-style boards, collaboration kits, and other presentation solutions, while the broader Boards collection includes whiteboards, bulletin boards, chalkboards, combination boards, conference room boards, lap boards, modular boards, easels, and other communication and display surfaces.

Discontinued Boards

Compare discontinued display, presentation, collaboration, and writing surfaces with currently available options from the broader Boards collection. Discontinued Boards includes double-sided magnetic whiteboards, easel-style boards, collaboration kits, and other presentation solutions, while the broader Boards...

1867 Results
Show: | |
MyBinding

features

  • Makes installing vinyl over rivets easier.
  • Made of stiff bristle synthetic fiber
  • Helps form flexible vinyl over the rivet surface.
  • Part Number: RB
Quartet

features

  • 1-month calendar with dry-erase surface.
  • Ideal for occasional use at home, work or school; Reuse month after month to stay organized year round.
  • 14" x 14" size board fits just about anywhere.
  • Black dry-erase surface color.
Best-Rite

features

  • Board Size: 18"H x 24"W
  • Surface Material: WhiteBoard/Hook and Loop
  • Ideal for group learning activities
  • Framed in satin anodized aluminum trim
Free Shipping
Balt

features

  • Size: 17"H x 58"W
  • Surface Material: Pebbles Vinyl
  • Easy to attach and detach without damage
  • Panels come in six widths from 21.5" to 66" to fit virtually any desk or other work surface.
Quartet

features

  • Size: 4' x 3'
  • Surface Material: Total Erase Laminate
  • Frame Material: Aluminum
  • Magnetic: No
Quartet

features

  • Size: 24 IN x 18 IN
  • Surface Material: Self-Healing Embossed Foam
  • Frame Material: Titanium Finish
  • Magnetic: No
Quartet

features

  • Durable black plastic hangers guarantee a coordinated hanging system in any contemporary office interior
  • 12 elegant, upscale hangers per set
  • Magnetic: No
  • Enclosed Board: No
Quartet

features

  • Packaged Quantity: 2 Set
  • Product Type: Dry Erase Board Eraser Refill
  • Recommended Use: Ink Remover, Dust Remover
  • Material: Felt
Quartet

features

  • Packaged Quantity: 1
  • Product Type: Eraseboard Grid Assistant
  • Color: Silver
  • Size: 4' x 6'
Quartet

features

  • Packaged Quantity: 1
  • Product Type: Eraseboard Grid Assistant
  • Color: Silver
  • Size: 3' x 4'
Free Shipping
Ghent

features

  • Size: 1.50" x 60"
  • Frame Material: Plastic
  • Allows the flexibility to post thick and thin items side by side.
  • Attach to the top of a board or mount separately.
Free Shipping
Ghent

features

  • Size: 16"x12"
  • Surface Material: Letterboard
  • Frame Material: Aluminum
  • Magnetic: No
Quartet

features

  • Undated monthly calendar format
  • Board includes a dry-erase marker with eraser cap and two round magnets
  • Dry-erase magnetic surface
  • 17" x 23" Board Size
Quartet

features

  • 1-month calendar with dry-erase surface.
  • Ideal for occasional use at home, work or school; Reuse month after month to stay organized year round.
  • 14" x 14" size board fits just about anywhere.
  • Bright Green dry-erase surface color.
Ghent

features

  • Size: 1.50" x 72"
  • Frame Material: Plastic
  • Allows the flexibility to post thick and thin items side by side.
  • Attach to the top of a board or mount separately.
Free Shipping
H. Wilson

features

  • Color: Purple
  • No. of Shelves: 3
  • With a clearance between shelves of 12" for easy access.
  • Legs are 1.5" square.
Best-Rite

features

  • Easily cleans any dry erase whiteboard surface with no streaking or ghosting.
  • Ready to USe
  • Also available in concentrated formula.
  • Recognized for Safer Chemistry by the EPA.
Drytac

features

  • Use on almost any dry interior surface.
  • Sheet Quantity: 25 Sheets
  • Film Size: 24" x 32"
  • Color: White with blue grid lines
Quartet

features

  • Writing surface features light grid pattern for writing alignment
  • Easy-to-clean writing surface requires occasional use of Quartet cleaning solutions
  • Patented Easy Mount hanging system secures board to wall in multiple places, guaranteeing easy and accurate installation
  • Frame Material: Aluminum
Quartet

features

  • 12 large magnets in modern geometric shapes with sleek metallic finishes
  • Secure and enhance postings on any magnetic surfaces
  • Convenient, clear plastic storage box keeps magnets in one place
  • Sleek metallic finish complements any contemporary environment.
Quartet

features

  • Perforated shelf above the rack adds additional storage
  • Fits 16 hangers
  • Attractive black steel complements any environment
  • Pair with Quartet hangers (20803) for complete garment storage
Quartet

features

  • Size: 4' x 10'
  • Surface Material: Cork
  • Frame Material: Satin Aluminum
  • Magnetic: No
Elmer's

features

  • Board Height: 48"
  • Board Width:36"
  • Board Surface Color:White
  • Tri-fold project display board
Best-Rite

features

  • Connector type:2 Way Straight Connector
  • Quantity: 1
  • Gives your modular panels greater versatility
  • Part Number:66206

Showing 192 of 1867 products