We're sorry, but we no longer offer this item.

Call us at 1-800-944-4573 for personalized recommendations
check out these similar items that may be a good fit

MyBinding

Item#: P103-08-12

$10.29

features

  • Length: 12" Letter (or choose other length)
  • Approximate Capacity: 54 Sheets (20# Bond)
  • Hole Pattern: 44 Hole
  • Quantity: 100 Per Box
$10.29
MyBinding

Item#: TC78.5X11S

features

  • Color: Clear
  • Size: 8.5" x 11"
  • Quantity: 100 pk
  • Thickness: 7 mil
$23.79
Choose Options
MyBinding

Item#: P103-10-12

$14.49

features

  • Length: 12" Letter (or choose other length)
  • Approximate Capacity: 75 Sheets (20# Bond)
  • Hole Pattern: 44 Hole
  • Quantity: 100 Per Box
$14.49
MyBinding

Item#: TC108.5X11S

features

  • Color: Clear
  • Size: 8.5" x 11"
  • Quantity: 100 pk
  • Thickness: 10 mil
$31.29
Choose Options
MyBinding

Item#: P103-06-12

$9.09

features

  • Length: 12" Letter (or choose other length)
  • Approximate Capacity: 30 Sheets (20# Bond)
  • Hole Pattern: 44 Hole
  • Quantity: 100 Per Box
$9.09
Quartet Prestige 2 3' x 2' Total Erase Magnetic Project Planner White Board - PP32P2
Quartet Prestige 2 3' x 2' Total Erase Magnetic Project Planner White Board - PP32P2
Quartet Prestige 2 3' x 2' Total Erase Magnetic Project Planner White Board - PP32P2
Quartet Prestige 2 3' x 2' Total Erase Magnetic Project Planner White Board - PP32P2
Quartet Prestige 2 3' x 2' Total Erase Magnetic Project Planner White Board - PP32P2

Quartet Prestige 2 3' x 2' Total Erase Magnetic Project Planner White Board - PP32P2


We're here for you!

Please call
1-800-944-4573
for help finding a comparable solution

Need Shopping Advice?
Call - (800)944-4573

Item#

  • Size: 3' x 2'
  • Surface Material: Painted Steel
  • Frame Material: Plastic/Aluminum
  • Magnetic: Yes