Site requirements should be considered before a purchase order is approved, especially for heavy, powered, or high volume equipment. Confirm floor space, door and lift access, electrical service, ventilation, noise limits, operator clearance, and the route used to remove waste. A machine that fits the listed footprint may still need additional room for feeding, service panels, bins, or conveyors. Confirm whether the unit can be moved safely and whether installation requires specialist support. Place the equipment in a controlled area where undestroyed media cannot be mixed with completed waste. Safety procedures, operator training, protective equipment, and emergency controls should also be planned before delivery. These details can affect both the machine choice and the total cost of putting it into regular use.